Bestla Tieback to the Brage Platform
Calder designed and built two pump packages for the brownfield Brage platform tieback developments. One an incredibly compact methanol injection package and the other a modular chemical injection package.
We worked closely with our customer, Aker Solutions AS – the EPCIC for the topside modifications – and the operator, OKEA ASA.

Case Study - Methanol Injection
Never have we had to fit so much equipment into such a small space. Methanol Injection - case study
